Platform DC
Development, deployment and data centre operations. Infrastructure

BUILT FOR AI.
Designed and manufactured in-house. Delivered and supported through one integrated platform.
Platform is building Britain’s next generation of AI infrastructure. We bring development, engineering, manufacturing, deployment, operations and maintenance together to turn powered sites into working capacity.
ENGINEERED AS A SYSTEM
Power. Data hall. Cooling.
Coordinated from the outset.
ILLUSTRATIVE ARCHITECTURE · NOT TO SCALE
Facility cooling and heat rejection are coordinated with the rack interfaces, operating temperatures and project requirements.
Thermal design / Cooling interfaces
Rack layout, connectivity, access and maintainability are planned around the selected compute architecture. Customer compute hardware is defined separately.
Rack architecture / Connectivity
Supply, distribution, protection and backup arrangements are coordinated with the site and the agreed resilience requirement.
Electrical architecture / Resilience
This schematic explains the system. Configuration, capacity, cooling and resilience are defined for each project.
DESIGNED IN BRITAIN. MADE IN BRITAIN.
Explore the six stages that connect Platform’s engineering, production and long-term support.

Bring power availability, location, connectivity and customer demand into the same development decision.
Site assessment / Delivery dependencies
Coordinate structure, power, cooling, access and resilience around the agreed operating requirement.
Coordinated design / Defined interfaces
Connect fabrication, assembly, integration and factory acceptance requirements through the in-house manufacturing process.
Factory integration / Inspection records
Sequence transport, lifting and installation with site readiness, utility interfaces and commissioning.
Installation / Acceptance evidence
Define operating responsibilities, procedures and service interfaces through the project agreement and handover.
Operating procedures / Agreed responsibilities
Bring maintenance access, planned care and lifecycle engineering into the design and long-term service scope.
Maintenance planning / Lifecycle support
BRITISH MANUFACTURING
Our established modular manufacturing site in Warrington brings engineering and production into the delivery chain. Repeatable assemblies, factory integration and test planning connect design to site delivery.
Inside our manufacturing approach
ONE INTEGRATED DELIVERY MODEL
Three businesses connect the physical delivery chain, from the first site assessment to long-term asset care.
Development, deployment and data centre operations. Infrastructure
Engineering, manufacture, assembly and factory testing. Manufacturing
Facilities management, maintenance and lifecycle engineering. Operations & maintenance
THREE TIERS. ONE PLATFORM.

20MW–100MW+
Large-scale developments for training, HPC and AI inference.
CONCEPT VISUALISATION
500kW–5MW
Regional deployments where power, connectivity and demand meet.
CONCEPT VISUALISATION
20kW–500kW
Compact infrastructure closer to users, devices and data.
CONCEPT VISUALISATIONDevelopment ranges describe the delivery models. Customer allocations and phased requirements are agreed individually.
| Model | Development range | Typical requirements | Delivery approach |
|---|---|---|---|
| Campus | 20MW–100MW+ | Training, HPC & large-scale inference | Phased campus development |
| Distributed | 500kW–5MW | Regional AI & enterprise compute | Power-led regional deployment |
| Microscale | 20kW–500kW | Inference & latency-sensitive workloads | Infrastructure at the network edge |
PLATFORM TODAY
Contracted progress. Development ambition. Different measures, clearly identified.
Capacity figures: 22 October 2026. Company profile: 24 October 2026. Contracted capacity is not a statement of commissioned or operational capacity. The 500MW roadmap is a development ambition, not contracted or available capacity; delivery depends on customer agreements, sites, planning, power and funding.

PROJECTS & PROGRESS
A planned AI infrastructure campus on the former Unilever industrial site. Initial demolition is complete; the planning application remains subject to determination.
Status published 24 October 2026. Development remains subject to planning, power delivery, funding and the agreed programme.
BANK QUAY / WARRINGTON CONCEPT VISUALISATION
PLATFORM INTELLIGENCE / THE ECONOMICS OF AI
Capital is flowing into AI. Power, production and the path to revenue determine what it can achieve. Explore the market bottlenecks—and how Platform’s integrated model is designed to address them.

PEOPLE & PLACE
Nearly 100 people across Platform DC, Platform Modular and Platform FM connect development, engineering, manufacturing, deployment, operations and maintenance.
YOUR NEXT DEPLOYMENT
Tell us the capacity, location and timing you need. We’ll bring the commercial, engineering and delivery questions together.
Discuss your deployment